Commercial real estate construction loans are short-term, interest-only financing that fund ground-up builds or major renovations in staged draws as work is completed. Typical terms run 12–36 months, lenders commonly cover about 60–75% of total project cost (loan-to-cost, or LTC), and you pay interest only on the balance that has actually been disbursed. The payoff usually comes from a property sale or a takeout mortgage once the asset is stabilized and generating predictable income.
To close on these loans, plan for several essentials: a clear exit (sale or a permanent loan), a complete and realistic budget that includes hard, soft, contingency, and an interest reserve, a path to approvals, a qualified general contractor and design team, and enough sponsor equity to fill the gap not covered by the lender. Below, you will see which structure fits different projects, what the timeline and fees look like, and a quick numerical example you can copy to estimate equity and monthly interest. If you want a deeper context on permanent loan sizing after construction, compare assumptions with this guide: Commercial real estate loan: 2026 guide to rates, terms, underwriting.

Commercial real estate construction loans: quick answer, first steps, timeline, and fast math
At a glance, a construction lender advances funds in phases (draws) as your project hits milestones: site work, foundations, vertical structure, MEP, interiors, and closeout. You only accrue interest on dollars already disbursed. Because the build period is riskier and shorter than a permanent loan, the rate is usually higher than long-term debt. Many banks price at an index plus a spread, while private lenders often quote a fixed coupon or a higher index-plus-spread to compensate for speed and flexibility.
First steps that move the needle with credit teams:
- Assemble a document set: plans and specs suitable for bidding, a detailed line-item budget, a month-by-month schedule, and a narrative exit plan.
- Lock your delivery team: an experienced GC with similar projects, an owner’s rep or construction manager if the team is lean, and an architect/engineer of record.
- Validate the market: realistic rents or sales values, a basic feasibility summary, and a preliminary appraisal engagement or broker opinion of value.
- Map approvals: list each entitlement and permit with dates and remaining conditions.
- Clarify capital: sources and uses, equity on hand, and any preferred equity or mezzanine terms if part of the stack.
Indicative timeline and when costs hit (bank example):
- Inquiry to indicative term sheet (3–10 business days): no hard costs unless you pursue a formal application.
- Application and deposit (1–3 days): your deposit funds third-party orders and lender counsel.
- Underwriting and third-party reports (2–4 weeks): appraisal, environmental Phase I (and Phase II if flagged), cost and plan/spec review, survey and title.
- Credit approval and closing (1–2 weeks after reports): negotiate loan documents, fund remaining closing costs and the initial interest reserve.
- First draw (post-close): inspector confirms work-in-place; retainage (often 5–10%) is withheld until near completion.
Private construction lenders compress the calendar to 7–21 days with lighter diligence but higher pricing. SBA structures can take 45–90 days due to program steps. For projects that still need entitlements or preleasing milestones, sponsors sometimes use a bridge loan first, then refinance into construction when the file is complete—see this overview for context: Commercial bridge loans: A Practical Guide for Investors and Owners.
Fast math example (investment multifamily):
- Total project cost (TPC): $10,000,000 (hard $7.4M + soft $2.1M + contingency $0.5M).
- Indicative LTC: 70% → Loan amount ≈ $7,000,000; required equity ≈ $3,000,000.
- Rate assumption: illustrative all-in 9.0%, interest accrues on drawn funds only.
- Draw profile over 18 months: if you assume a linear spend for quick planning, the average outstanding ≈ 50% of loan ≈ $3,500,000.
- Estimated monthly interest: $3,500,000 × 9.0% ÷ 12 ≈ $26,250.
- Interest reserve (18 months): ≈ $26,250 × 18 ≈ $472,500; your lender will size this against the inspector’s curve rather than a perfectly linear line.
- Exit check: projected stabilized NOI $850,000. If a permanent lender sizes at 1.30× DSCR and 7.25% rate/30-year amortization, maximum debt might pencil in the $8.5–$9.0M range (calculator-dependent), leaving room to take out a $7.0M construction balance assuming rents and expenses hold.
Types of commercial real estate construction loans, side-by-side
Several structures are common. Your fit depends on project profile, sponsor strength, timeline, and desired flexibility at stabilization. The comparison below outlines typical ranges and the trade-offs often discussed on term sheets.
| Loan type | Typical LTC | Rate structure | Term and extensions | Speed to close | Recourse | Typical loan size | Draw/inspection | Fees (origination) | Best for | Key trade-offs |
|---|---|---|---|---|---|---|---|---|---|---|
| Construction-only (bank) | 60–75% | Index + spread; floating | 12–24 mo + 1–2 short extensions | 30–60 days | Often full or limited | $2M–$50M+ | Inspector + 5–10% retainage | 0.5–1.5% | Institutional-style projects with clear exit | Lower cost vs. slower process, covenants, tighter controls |
| Construction-to-permanent (one-time close) | 60–70% | Construction float, then fixed or floating perm | 12–24 mo build + 5–30 yr perm | 45–75 days | Commonly recourse during build | $1M–$30M+ | Standard inspections | 0.75–2.0% | Owners or investors who want takeout certainty | Convenience vs. fewer takeout options later if markets improve |
| SBA 7(a) (owner-occupied) | Up to ~85–90% of eligible cost combined | Prime-based floating | Build period + up to 25 yrs | 45–75 days | Personal recourse per program | $0.5M–$5M+ | Inspections; program-specific | ~2–3.5% incl. SBA fees | Small businesses building facilities they occupy | Higher fees, eligibility rules, owner-occupancy requirements |
| SBA 504 (owner-occupied) | Up to ~80–90% combined (50/40/10 stack) | Bank first float; SBA second often fixed | Build + 10/20/25 yrs on CDC second | 60–90 days | Personal recourse per program | $1M–$20M+ (project basis) | Bank + CDC oversight | ~1–3% bank + SBA costs | Fixed-asset expansion with longer fixed-rate | More paperwork; use-of-proceeds restrictions |
| Private/hard money construction | 50–65% | Fixed or index + higher spread | 9–18 mo + short extensions | 7–21 days | Often full or limited | $0.5M–$30M | Streamlined inspections | 2–4% (or more) | Speed, complex stories, entitlement risk | Higher cost for faster funding and flexibility |
| Bridge + mezz/pref equity (context) | Senior 60–70% + mezz/pref to 80–85% total | Senior float; mezz/pref coupon or IRR | 12–36 mo | 2–4 weeks | Senior often recourse; mezz covenants vary | $5M–$100M+ | Case-by-case | Senior 1–2%; mezz/pref adds cost | Capitalizing larger or higher-leverage plans | Complex docs, intercreditor, higher blended cost |
Which option fits?
- Owner-occupants with stable finances often prefer SBA 504 for its long fixed-rate second and lower cash in, or a bank one-time-close to avoid a second closing later.
- Investment developers who expect to shop the permanent loan at stabilization may favor construction-only bank debt for flexibility.
- Projects with unfinished entitlements, tight timelines, or complicated rehabs sometimes benefit from private construction capital or a bridge-to-construction plan.
If you intend to keep the asset and refinance, coordinate early with your future permanent lender so construction covenants and stabilization definitions support the exit. For debt strategies after stabilization, see: Loan repayment strategies for real estate debt.
How these loans work from application to takeout
Application and approval: Lenders underwrite the sponsor, the project itself, and the market. Expect requests for sponsor resumes and financials, experience with similar projects, the development budget with contingencies, the construction schedule, a sources-and-uses statement, and a narrative describing the exit plan. Third-party orders typically include an appraisal with an as-completed value, an environmental review, a plan/spec and cost review, a title update with endorsements, and a survey.
Closing documents and conditions precedent: Before first draw, most lenders require signed loan documents, builder’s risk and general liability insurance, flood coverage if indicated, recorded security instruments, a GMP contract or equivalent, detailed plans and specs, permits to start, and a draw schedule. Some banks also ask for a completion guaranty and minimum liquidity covenants for the sponsor.
Phased draws and inspections: The lender holds the total commitment and disburses against verified work-in-place. An independent inspector or cost consultant certifies percent complete. Retainage (commonly 5–10% of each eligible line) is held until substantial completion and punch-list resolution. Stored materials can be financed if they meet conditions such as clear title, secured storage, and insurance.
Interest-only on drawn balance: Because debt service is only calculated on funds actually disbursed, the carry load is lighter at the start and peaks near the end. Many notes include an interest reserve sized to the draw curve so you are not writing monthly checks out of operating cash while the building generates no income. The reserve may also cover real estate taxes and insurance during construction if budgeted that way.
Extensions and milestone management: Most construction loans include one or two extension options for an agreed fee, subject to no default, on-budget status, and additional reserve contributions if needed. Missing key milestones can trigger enhanced oversight or a requirement to add equity. Communicate early if supply-chain delays or weather push the schedule; lenders generally work with sponsors who surface issues ahead of time and propose fixes.
Takeout strategies and stabilization: Repayment typically comes from a sale at or soon after certificate of occupancy, or a refinance into a permanent mortgage. Permanent lenders usually want a minimum occupancy and income history before closing—common expectations are 90–95% physical occupancy with one to three months of collected rents for multifamily, and signed leases with burn-off of concessions for commercial. If your target exit is a permanent loan, align on DSCR, LTV, amortization, and reserve requirements at the outset so your build loan dovetails into your takeout.
What lenders look for (and how to qualify)
LTC and as-completed LTV: Construction loans are sized primarily on loan-to-cost but cross-checked against the appraiser’s as-completed value. A bank offering 70% LTC may still cap at, say, 65–70% of as-completed value. If bids rise or the appraisal is conservative, equity increases or scope adjusts.
Budget quality: A credible line-item breakdown shows hard costs (site work, structure, MEP, interiors), soft costs (A/E, permits and fees, surveys, testing, legal, lender costs), contingency, and an interest reserve. A third-party cost review will sanity-check quantities, unit costs, inclusions and exclusions, and schedule logic. Include procurement plans for long-lead items and escalation assumptions for sensitive trades.
Sponsor equity and experience: Lenders want to see cash in the deal and relevant execution history. Recently purchased land at market can count as equity; older land may be marked down to a supported value. If you are new to development, surround yourself with an experienced GC, construction manager, and architect, show conservative leverage, and consider a smaller first project.
Contractor credentials and delivery method: Strong lenders are comfortable with a qualified GC on a GMP or a cost-plus with a GMP cap. Design-build can work when the team is experienced. On larger jobs, some banks require bonding or a subcontractor default insurance program to manage risk. Provide safety record, financial capacity, and subcontractor strategy.
Market support and leasing expectations: Underwriting differs by asset class. Build-to-suit industrial or medical projects typically hinge on tenant credit and lease term. Retail often relies on anchor strength and the merchandising plan, with LOIs evaluated alongside tenant improvement and leasing commission budgets. Multifamily underwriting considers realistic rents, a 5–7% economic vacancy, and absorption timing rather than presales.
Recourse vs. non-recourse: Many bank construction loans require personal recourse, often with completion and carry obligations. Larger institutional loans can be structured as non-recourse with carve-outs, but even then, completion support and minimum liquidity/net-worth covenants are common. Read guaranty language carefully and compare scopes across term sheets, not just the headline word “non-recourse.”
Rates, fees, and total project cost—what to expect
Rate structure: Bank construction notes are usually floating at an index plus a spread, with spread driven by leverage, sponsor strength, and property type. Private construction financing can be quoted as a fixed coupon or a higher spread over an index. Construction-to-perm loans blend a floating construction period with a fixed or floating takeout rate at conversion. Because you only pay interest on drawn funds, the effective cost of capital depends on your draw slope as much as your quoted rate.
Upfront and ongoing costs to plan for:
- Origination and underwriting: roughly 0.5–2.0% of the commitment depending on lender type and complexity.
- Third-party reports: appraisal, environmental, survey, title, and a cost/plan review; specialized studies as needed.
- Legal and documentation: lender counsel and your counsel, including intercreditor work if mezzanine or preferred equity is present.
- Draw/inspection fees: per-visit inspector charges and wire fees; some lenders charge monthly admin or field-review fees.
- Interest reserve: sized to your draw schedule and often required at closing.
- Extension fees: quoted in the term sheet for optional months if you need extra time.
Budget safeguards that reduce surprises:
- Contingency: 5–10% of hard costs depending on scope certainty; renovations with unknowns usually require the higher end.
- Escalation and procurement: lock long-lead or volatile items early where practical (HVAC equipment, switchgear, roofing, glass).
- Soft-cost placeholders: tap/impact fees, utility connections, testing/inspections, builder’s risk policy, owner’s rep, and a realistic start-up operating allowance.
- Lease-up or sales costs: marketing, brokerage, concessions, and working capital until rents stabilize or units sell.
Term sheet comparison checklist
- Total proceeds against both LTC and as-completed LTV; model sensitivities for appraisal and bid shifts.
- All-in interest based on a month-by-month draw curve, not the headline rate alone.
- Recourse and completion obligations with definitions and any caps.
- Change-order approval thresholds, reallocation rules, and contingency controls.
- Extension mechanics, pricing, and any reserve top-up or re-margining triggers.
- Draw frequency, inspector process, retainage percentage, and funds turnaround time.
- Third-party scope and who pays for second opinions or re-reviews if required.
- Closing certainty: credit committee cadence, legal timelines, and conditions precedent.
If tax planning matters for your investors, consider whether a cost segregation study after completion could accelerate depreciation. For planning context, see: Cost segregation for commercial real estate: 2026 owner’s guide.
Property-type nuances and structuring tips
Multifamily: Lenders tend to be comfortable with garden and mid-rise projects in submarkets with demonstrated absorption. Underwriting applies conservative rent assumptions, 5–7% economic vacancy, and tests lease-up concessions. While presales are not the norm, a detailed lease-up plan, realistic operating expenses, and amenities that support absorption (parking ratios, package rooms, pet policies) help. At stabilization, many sponsors compare bank portfolio loans and agency executions; align on DSCR and sizing early with a permanent lender.
Industrial and flex: For build-to-suit, a signed lease with term beyond the permanent loan horizon is common. For speculative small-bay or flex, lenders study demand from local businesses, historic vacancy, and competition. Shell and site work dominate costs; include geotech and site utility contingencies, and allow time for long-lead dock equipment and electrical gear.
Retail: Underwriting focuses on anchor strength, co-tenancy dynamics, and tenant-credit mix. LOIs are helpful but may be haircut based on credit and the cost of tenant improvements and leasing commissions. Restaurants and food uses require diligence on grease interceptors, venting, and parking; expect downtime assumptions between tenants.
Office and medical: Traditional multi-tenant office is often underwritten conservatively. Preleasing requirements can be significant, and lenders will model free rent, TI, and commissions with realistic downtime. Medical office with credit tenancy and longer terms can be more financeable; compliance, specialized buildouts, and parking ratios are key.
Hospitality: New hotel construction faces demand variability and ramp timing. Underwriting leans on flag strength, feasibility studies, RevPAR penetration, and a credible ramp plan. Size the interest reserve to carry through ramp, not just construction. Some sponsors focus on renovations or property-improvement plans instead of new development unless market cases are compelling.
Specialized assets: Cold storage, self-storage, senior housing, and student housing bring unique metrics—temperature-controlled MEP, prelease deposits, staffing models, or school-cycle exposure. Lenders that specialize in a given segment will understand nuances and may offer better structures, but expect tighter covenants and more third-party work.
Common pitfalls, FAQs, and quick calculators
Frequent mistakes that slow or sink approvals—and practical fixes:
- Vague or thin budgets: Round numbers and missing lines signal risk. Fix: obtain a third-party cost review, provide unit-cost support, and include a 5–10% hard-cost contingency.
- Unclear approvals path: “Permits pending” without dates stalls credit. Fix: provide a dated approvals matrix and correspondence from authorities on expected milestones.
- Weak exit narrative: “Sell or refi” without numbers is not a plan. Fix: show a takeout prequalification or model debt sizing with current DSCR assumptions and a broker opinion of value.
- Unproven team for the scope: Lenders hesitate when the GC or sponsor lacks relevant executions. Fix: add an experienced GC, hire a construction manager, and include references and completed project sheets.
- Understated carry: Forgetting taxes, insurance, and working capital strains cash. Fix: size the interest reserve from a realistic draw curve and include T&I and start-up operating allowance.
- Optimistic rents or cap rates: Underwriting will sensitize. Fix: include downside cases that still repay the loan and highlight decisions that protect the plan if conditions soften.
- No liquidity cushion: Equity funded but no liquidity for change orders worries lenders. Fix: evidence post-close liquidity and partner support, not just capital committed at closing.
Is it hard to get a loan for a commercial building under construction? It can be challenging if the plan, team, and exit are not well-defined. Lenders concentrate on completion risk, cost control, and market feasibility. Sponsors who show conservative leverage, a credible schedule and budget, and a strong delivery team improve the chance of approval. If your file is still forming, a bridge facility to complete entitlements or leasing milestones may be more realistic before a full construction note—see our guide: Commercial bridge loans: A Practical Guide for Investors and Owners.
How much down payment or equity do I need? For investment projects, plan on roughly 25–40% of total project cost as equity when typical LTC is 60–75%. For owner-occupied projects using SBA 7(a) or 504, effective cash in can be lower due to program structures, but there are eligibility rules and fees to model.
Do construction loans require 20% down? Many require more than that when measured against total project cost. Bank construction LTC often tops at about 70%, implying around 30% equity. Private lenders may offer lower LTC but faster execution. SBA owner-user deals can support less cash in, but program rules and additional costs apply.
What is the difference between LTC and LTV? LTC compares the loan to total project cost; LTV compares the loan to the appraised value at completion. A lender might offer 70% LTC but also require that the loan not exceed 65–70% of as-completed value. If costs rise or the appraisal is conservative, either test can limit proceeds.
How long does a commercial construction loan take to close? Bank construction loans typically take 30–60 days after a complete application, driven by third-party timelines and committee calendars. Construction-to-perm and SBA deals can take 45–90 days. Private construction loans can close in 7–21 days if title, insurance, and basic diligence are ready.
What is the monthly payment on a $100,000 construction loan? During construction, payments are usually interest-only on the drawn amount. Quick calculator: outstanding balance × annual rate ÷ 12. If $100,000 is fully drawn at a 10% illustrative rate, monthly interest ≈ $833. If the average outstanding is $50,000, it’s ≈ $417 per month. Always model your actual draw curve and quoted rate.
How do I size an interest reserve? Start with a monthly draw schedule. Multiply each month’s average outstanding by the monthly rate (annual all-in rate ÷ 12). Sum across the construction period and any months of lease-up you want covered. Add a cushion, commonly 5–10%, and review again after major bid or schedule updates.
How do I choose between construction-only and construction-to-permanent? If you want flexibility to shop the permanent market at stabilization and think pricing or programs may improve, construction-only preserves options. If closing certainty is more valuable and the offered takeout rate is acceptable, a one-time close can simplify life—especially for owner-occupants or smaller balance projects.
Where can I get a broader primer on loan types and what lenders look for beyond construction? Try these related explainers: Master Real Estate Loans: Types, Terms, & Conditions Explained and Loan Eligibility Credit Score: What Lenders Look For. Both help frame conversations with lenders after your project stabilizes and you are considering long-term debt.